NEW QUESTION 1
In a project, total float measures the:

  • A. Ability to shuffle schedule activities to lessen the duration of the project.
  • B. Amount of time an activity can be extended or delayed without altering the project finish date.
  • C. Cost expended to restore order to the project schedule after crashing the schedule.
  • D. Estimate of the total resources needed for the project after performing a forward pas

Answer: B

NEW QUESTION 2
The risk shared between the buyer and seller is determined by the:

  • A. assumption log.
  • B. quality checklist.
  • C. risk register.
  • D. contract typ

Answer: D

NEW QUESTION 3
Through whom do project managers accomplish work?

  • A. Consultants and stakeholders
  • B. Stakeholders and functional managers
  • C. Project team members and consultants
  • D. Project team members and stakeholders

Answer: D

NEW QUESTION 4
The cost baseline and project funding requirements are outputs of which process in Project Cost Management?

  • A. Estimate Costs
  • B. Control Costs
  • C. Plan Cost Management
  • D. Determine Budget

Answer: D

NEW QUESTION 5
A project lifecycle is defined as:

  • A. a collection of generally sequential and sometimes overlapping project phases.
  • B. a process required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.
  • C. a recognized standard for the project management profession.
  • D. the application of knowledge, skills, tools, and techniques to project activities to meet the project requirement

Answer: A

NEW QUESTION 6
An input to Close Project or Phase is:

  • A. Accepted deliverables,
  • B. Final products or services,
  • C. Document updates,
  • D. Work performance information.

Answer: A

NEW QUESTION 7
Which schedule compression technique has phases or activities done in parallel that would normally have been done sequentially?

  • A. Crashing
  • B. Fast tracking
  • C. Leads and lags adjustment
  • D. Parallel task development

Answer: B

NEW QUESTION 8
The procurement process that documents agreements and related documentation for future reference is known as:

  • A. Plan Procurements.
  • B. Control Procurements.
  • C. Close Procurements.
  • D. Conduct Procurement

Answer: C

NEW QUESTION 9
Tools and techniques used in Direct and Manage Project Work include:

  • A. Process analysis and expert judgment
  • B. Analytical techniques and a project management information system
  • C. Performance reviews and meetings
  • D. Expert judgment and meetings

Answer: D

NEW QUESTION 10
The total of the planned value (PV) is also known as:

  • A. work breakdown structure (WBS).
  • B. schedule target.
  • C. performance measurement baseline (PMB).
  • D. earned value baselin

Answer: C

NEW QUESTION 11
Which of the following is a tool and technique used to monitor risk?

  • A. Technical performance measurement
  • B. Cost performance baseline
  • C. Benchmarking
  • D. Cost of quality

Answer: A

NEW QUESTION 12
The zero duration of milestones in project planning occurs because milestones:

  • A. Are unpredictable and challenge the Plan Schedule Management process.
  • B. Occur at random times in the project plans.
  • C. Represent a moment in time such as a significant project point or event.
  • D. Represent both significant and insignificant points in the project and are difficult to anticipat

Answer: C

NEW QUESTION 13
Configuration identification, configuration status accounting, and configuration verification and audit are all activities in which process?

  • A. Perform Quality Assurance
  • B. Direct and Manage Project Work
  • C. Monitor and Control Project Work
  • D. Perform Integrated Change Control

Answer: D

NEW QUESTION 14
In complex projects/ initiating processes should be completed:

  • A. Within a work package.
  • B. In each phase of the project.
  • C. To estimate schedule constraints.
  • D. To estimate resource allocation

Answer: B

NEW QUESTION 15
What is the probability of occurrence if the risk rating is 0.56 and the impact if the risk does occur is very high (0.80)?

  • A. 0.45
  • B. 0.56
  • C. 0.70
  • D. 1.36

Answer: C

NEW QUESTION 16
Which type of contract is most commonly used by buying organizations because the price for goods is set at the outset and is not subject to change unless the scope of work changes?

  • A. Fixed Price with Economic Price Adjustments Contract (FP-EPA)
  • B. Cost-Reimbursable Contract (CR)
  • C. Firm-Fixed -Price Contract (FFP)
  • D. Fixed-Price-Incentive-Fee Contract (FPIF)

Answer: C

NEW QUESTION 17
In a typical project, project managers spend most of their time:

  • A. Estimating
  • B. Scheduling
  • C. Controlling
  • D. Communicating

Answer: D

NEW QUESTION 18
A tool and technique used during the Collect Requirements process is:

  • A. prototypes.
  • B. expert judgment.
  • C. alternatives identification.
  • D. product analysi

Answer: A