3V0-624 | Renovate VMware 3V0-624 braindumps


P.S. Approved 3V0-624 vce are available on Google Drive, GET MORE: https://drive.google.com/open?id=1eINzd6M2vOHYKJToFohMz1RDsHdhNblV


New VMware 3V0-624 Exam Dumps Collection (Question 2 - Question 11)

Q1. A leading steel manufacturer relies on SAP for purchase, sales, add invoice processing.

u2022 It is planning to virtualize its severs to reduce CAPEX and OPEX.

u2022 However, its CIO is concerned about the availability, performance, manageability, recoverability, and security for the SAP database and ERP instance.

Match the business requirement with the appropriate design concept.

Answer:

Q2. A customer warns to virtualize an Oracle database with vSphere 6.5, but is concerned about its performance.

Which three design elements will ensure optimum performance? (Choose three.)

A. Share as much memory as possible with the balloon driver.

B. Use VMXNET3 for the network adapter.

C. Create affinity rules for the virtual machine to a single physical socket.

D. Use VMware Paravirtual SCSI adapters for data and log vDisk.

E. Enable Hyper-Threading

Answer: A B E

Q3. A customer is using blade servers with only one HBA.

Which two design concepts apply to this scenario? (Choose two.)

A. Assumption

B. Risk

C. Constraint

D. Requirement

Answer: B

Q4. After the vSAN iSCSI Target service is enabled, which statement about iSCSI networks is true?

A. A separate VMkernel interface may be configured per target.

B. A single VMkernel interface must be selected for all iSCSI targets.

C. The vSAN iSCSI Target service always uses all Management VMkernel interfaces.

D. The vSAN iSCSI Target service always uses the vMotion network.

Answer: A

Q5. The customer has two sites that must operate independently of each other in the event of a WAN failure. During normal operations, administrators from each site must be able to manage the other site through the vSphere Web Client.

Which vCenter Server Appliance (VCSA) and Platform Services Controller (PSC) diagram shows the VMware-recommended design that satisfies these requirements?

A. Exhibit A

B. Exhibit B

C. Exhibit C

D. Exhibit D

Answer: D

Q6. A customer is currently running a vCenter Server 5.5 environment with 48 identically-configured ESXi hosts.

u2022 These ESXi hosts are divided into six 8-host HA/DRS clusters.

u2022 The customer wants to upgrade to vSphete 6.5 and combine all of its ESXi hosts into a single 48-host HA/DRS cluster.

Place these actions in the correct order to accomplish this.

Answer:

Q7. Match the business statement to its appropriate concept.

Answer:

Q8. The ability to live-migrate all virtual machines between two clusters is a requirement in the customer's design. Which two clusters and EVC configurations will accomplish this? (Choose two)

A. Cluster 1

u2022 ESXi 6.0

u2022 Intel Skylake CPUs

u2022 EVC Enabled: AMD OpteronTM "Steamroller" Generation Cluster 2

u2022 ESXi 6.5

u2022 AMD Steamroller CPUs

u2022 EVC Enabled: AMD OpteronTM u201cSteamroller" Generation

B. Cluster 1

u2022 ESXi 5.6

u2022 Intelu00ae Broadwell CPUs

u2022 EVC Disabled Cluster 2

u2022 ESXi 6.5

u2022 Intelu00ae Broadwell CPUs

u2022 EVC Disabled

C. Cluster 1

u2022 ESXi 5.5

u2022 AMD Piledriver CPUs

u2022 EVC Enabled: AMD OpteronTM "Piledriver" Generation Cluster 2

u2022 ESXi 6.5

u2022 AMD Steamroller CPUs

u2022 EVC Enabled: AMD OpteronTM u201cPiledriver" Generation

D. Cluster 1

u2022 ESXi 6.5

u2022 Intel Broadwell CPUs

u2022 EVC Enabled: Intelu00ae u201cBroadwell" Generation Cluster 2

u2022 ESXi 6.5

u2022 Intel Sandy Bridge CPUs

u2022 EVC Enabled: Intelu00ae u201cSandy Bridge" Generation

Answer: AC

Q9. In the vCenter HA configuration below, drag the two correct components to the blank boxes in this diagram. The same component may be used more twice (Choose two.)

Answer:

Q10. An architect is designing a vSphere 6.5 implementation.

u2022 The customer requires Cross vCenter vMotion for the newly-created data centers in New York and Houston.

u2022 Each data center will use different IP networks for management and vMotion.

When creating a vMotion network, which two statements are required in order to use Cross vCenter Server vMotion? (Choose two.)

A. vMotion Networks in both data centers must be in the same L2 stretched VLAN.

B. The virtual machine port groups must use the same name.

C. VMkernel port for vMotion must be configured with vMotion TCP/IP Stack with the correct gateway.

D. vMotion networks in both data centers must be routable over L3 network.

Answer: AC

Recommend!! Get the Approved 3V0-624 dumps in VCE and PDF From Certifytools, Welcome to download: https://www.certifytools.com/3V0-624-exam.html (New Q&As Version)