650-059 | Leading 650-059 Exam Study Guides With New Update Exam Questions


P.S. Realistic 650-059 answers are available on Google Drive, GET MORE: https://drive.google.com/open?id=1cG5YkQOEnI9Jhzqan9xwrJNT7m15Jfvd


New Cisco 650-059 Exam Dumps Collection (Question 2 - Question 11)

Q2. What is primary objective of the security architecture assessment?

A. create e design specification dcument

B. document the customer`s current and future technology projects

C. integrate routing and switching into the existing security architecture to protect networks and information against intruders

D. document power and UPS availability

Answer: C

Q3. What is the primary objective of performing a network readiness assessment in the plan phase?

A. align business requirements to technical requirements

B. assess the current network infrastructure`s ability to adequately support the new solution and identify new requirements

C. create a plan to recycle used equipment

D. install and test system components in a non-production environment

Answer: B

Q4. In wich service component in the design phase would you provide a site-specific system implementation plan which defines the activities, configraions, and commissioning test plans required to implement routing and switching solution components and software?

A. staging plan development

B. detailed design development

C. project kick-off

D. systems acceptance test plan development

E. implementation plan development

Answer: E

Q5. Which of these best describes the actions you would take during the business requirements development service component in the prepare phase?

A. analyze the customer`s business requirements for a new solution.

B. analyze the customer`s ongoing business case requirements

C. determine the customer`s technology requirements.

D. determine the appropriate cooling temperature for the customer`s server room.

Answer: A

Q6. Preparing, conducting, and performing a security gap analysis is part of which service component in the plan phase?

A. operations readiness assessment

A. B. planning project kickoff

C. security architecture assessment

D. security administration

Answer: C

Q7. In which of these implement phase service components do you address the support and handoff process?

A. post-implementation support handoff meeting

B. staging and system migration

C. staff training

D. detailed design development

Answer: A

Q8. Which of these best describes the actions you would take during the technology strategy development service component?

A. analyze the customer`s business requirements and recommend the appropriate technologies to meet those business requirements.

B. identify the customer`s business requirements for the proposed solution.

C. address the customer`s physical site requirements.

A. D. determine the appropriate end user training needed for the technology solution.

Answer: A

Q9. In which service component of the prepare phase would you identify factors such as solution goals, business drivers, and success criteria?

A. technology strategy development

B. business requirements development

C. high-level design development

D. proof of concept

Answer: B

Q10. Which two of these activities are part of the phased implementation service component in the implement phase? (choose two)

A. develop a staff training program plan

B. conduct a kickoff meeting

C. prepare the site for the system implementation

D. install, confgure, integrate and test infrastructure

Answer: C,D

Q11. Which two service components are performed during the implement phase? (choose two)

A. site readiness specification

B. staging

C. phased implementation

D. security readiness assessment

E. configuration management

Answer: B,C

P.S. Easily pass 650-059 Exam with Certifytools Realistic Dumps & pdf vce, Try Free: https://www.certifytools.com/650-059-exam.html (50 New Questions)