NEW QUESTION 1
A Six Sigma tool that helps to screen factors by using graphical techniques to logically subgroup multiple discrete X's plotted against a continuous Y is known as a __________ Chart.

  • A. SIPOC
  • B. Multi-Vari
  • C. Box Plot
  • D. Whisker

Answer: B

NEW QUESTION 2
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?

  • A. Individual-Moving Range
  • B. Xbar-R Charts
  • C. Xbar-S Charts
  • D. nP and P Charts

Answer: B

NEW QUESTION 3
Six Sigma refers to a process whose output has at least 80% of its data points within +/- 6 Standard Deviations from the Mean.

  • A. True
  • B. False

Answer: B

NEW QUESTION 4
Which statement(s) are true about the Fitted Line Plot shown here? (Note: There are 2 correct answers).

  • A. When Reactant increases, the Energy Consumed increases.
  • B. The slope of the equation is a positive 130.5.
  • C. The predicted output Y is close to -18 when the Reactant level is set to 6.
  • D. Over 85 % of the variation of the Energy Consumed is explained by the Reactant via this Linear Regression.

Answer: CD

NEW QUESTION 5
If the data displayed in a Histogram displays two peaks the distribution would likely be __________.

  • A. Transformed
  • B. Multi-skewed
  • C. Bi-attribute
  • D. Bimodal

Answer: D

NEW QUESTION 6
Non-parametric testing is done when which of these are applicable? (Note: There are 3 correct answers).

  • A. When the traditional t tests don’t produce the results we need
  • B. A Hypothesis Test for the Median of the population is in question
  • C. It does not require data to come from Normally Distributed populations
  • D. They look at the Median rather than the Mean of populations
  • E. When there are no parameters to measure in the process

Answer: BCD

NEW QUESTION 7
A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?

  • A. Never, a Control Plan is a living document
  • B. As soon as the Champion signs off
  • C. Within 30 days of the LSS project review team meeting
  • D. After the project has been presented at the recognition event

Answer: A

NEW QUESTION 8
Unequal Variances can be the result of differing types of distributions.

  • A. True
  • B. False

Answer: A

NEW QUESTION 9
SPC charts typically have the most recent data point on the right hand side.

  • A. True
  • B. False

Answer: A

NEW QUESTION 10
Use of the __________ approach is the most classic arrangement when constructing a Fishbone Diagram.

  • A. Chronological
  • B. 6M
  • C. 5M
  • D. Alphabetical

Answer: B

NEW QUESTION 11
Voice of the Customer is a Lean Six Sigma technique to determine __________ attributes of a product or service.

  • A. At least 6
  • B. The profitable
  • C. Critical-to-Quality
  • D. The majority of the

Answer: C

NEW QUESTION 12
The Empirical Rule is important because it provides an estimate of the probability of an event occurring depending on the Standard Deviation from the Mean.

  • A. True
  • B. False

Answer: A

NEW QUESTION 13
Lean had its origins in the development and practice of the __________ Production System.

  • A. Honda
  • B. Toyota
  • C. Ford
  • D. Motorola

Answer: B

NEW QUESTION 14
When utilizing Statistics the population is defined as a collection of all the individual data points of interest.

  • A. True
  • B. False

Answer: A

NEW QUESTION 15
Bias in Sampling is an error due to lack of independence among random samples or due to systematic sampling procedures.

  • A. True
  • B. False

Answer: A

NEW QUESTION 16
When creating a Cause and Effect Diagram the team needs to continually broaden their view as well as drill down until they identify all the potential __________ impacting their process.

  • A. Line operators
  • B. Root Causes
  • C. Inventory issues
  • D. Customer requests

Answer: B

NEW QUESTION 17
Select all the statements that are true after reviewing the Capability Analysis shown here. (Note: There are 4 correct answers).

  • A. The process is out of Control.
  • B. The process is properly assumed to be a Normal process.
  • C. The Mean of the process moving range is 1.78.
  • D. This Capability Analysis used subgroups.
  • E. Majority of the dimensional values are outside of the tolerance than within.

Answer: BCDE

NEW QUESTION 18
......